domingo, 19 de septiembre de 2010

Ome modification of the rates adopted might be justifi

Idenced by the fact that the roller makes but a slight track in the
surface. The second layer of stone is then placed and rolled in the same
manner as the first.
=Spreading Screenings.=--After the upper course has been rolled, the
screenings are spread on it from piles alongside the road, enough being
used to fill

No hay comentarios: